building with EXCELLENCE
The website is still under construction. In the meantime scroll down to see a few completed projects!
The website is still under construction. In the meantime scroll down to see a few completed projects!
We'd love to hear from you!
Give us a call at (336) 542-7498
or email Contact@PinetopConstructionCompany.com
Bringing fill dirt in for the foundation
Pouring the master bathroom shower floor 3" lower to acomidate a curdles shower
Monolithic condition poured and being watered for 4 days afterwards to reduce the chances of the concrete cracking
Framing package was delivered
Exterior wall framing is complete
Trusses delivered
Framing is complete
Interior framing
Looking towards the kitchen
Bathroom plumbing rough in
Kitchen knee wall built
James Hardie siding delivered
James Hardie siding installed
James Hardie installed
Isolating cracks in the concrete with mesh tape and red guard
Isolating cracks in the concrete with mesh tape and red guard
Finished product... new siding, door, trim, roof, gutters
Finished product... new siding, door, trim, roof, gutters
Dividing wall to separate shop from lobby
Closed cell foam insulation
Beginning of the project
Beginning of the project
Beginning of the project
Beginning of the project
Starting demo
Down to the frame
Before
After
Before
After
Before
Before
Demo
Herring bone tile install
Herring bone tile install
Started with a cleared lot
Brought fill dirt in
Pouring a monolithic slab... forms have been installed, footers dug, termite pretreat sprayed, rebar added, 6 mil vapor retarder
Slab poured and finished with the anchor bolts installed for the red iron
Building frame being erected
Completed 4,200 sqf Vulcan Steel building
Completed 4,200 sqf Vulcan Steel building
Damaged house after Hurricane Micheal
Damaged house after Hurricane Micheal
Damaged house after Hurricane Micheal
Damaged house after Hurricane Micheal
Most of the interior was gutted
laying out the new cabinet design
Added 2 gables and a massive porch
Removed the vinyl siding and installing James Hardie siding
James Hardie siding
James Hardie siding
James Hardie Siding
Building the front steps
Painted the James Hardie siding with Sherwin Williams exterior Super Paint
Painted the James Hardie siding with Sherwin Williams exterior Super Paint
Painted the James Hardie siding with Sherwin Williams exterior Super Paint
Stained the proches and ceilings of the gables
Stained tongue and groove gable ceilings
Added Feeney cable rails
Added Feeney cable rails
Added LED strip lights under the handrails
Refinished the hardwood floors, new drywall, trim, and barn doors
Installed a new ventless fireplace
Repurposed existing wood wall pannels for an accent around the mantel
Ship lap wall, new cabinits and built in shelves
Finishing up paint in the kitchen
Plumbing trim out
Massive semi circle driveway
Start of the project
Start of the project
Adding interior walls
Adding interior walls
Adding interior walls
Finished exam room
Finished lab room
Finished office